Castlemaine Botanical Gardens gate restoration This project involved conservation works to the main gates of the garden and replaced damaged or missing metal spears.
Castlemaine Botanical Gardens lighting upgrade project This project will see Castlemaine Botanical Garden’s entire walking/cycling track be lit all the way with new lighting.
Castlemaine Primary School Traffic Studies This project analysed traffic conditions around three schools in Castlemaine to provide documentation required to plan for essential safety infrastructure.
Fogartys Gap Road Upgrade - Stage 1 This project will reconstruct a 2.24km section of Fogartys Gap Road in Ravenswood South.
Fogartys Gap Road upgrade - stage 2 Fogartys Gap Road is a rural link road between Maldon and Calder Highway. The road is a popular route for local cyclists as well as commuters between Maldon, Castlemaine and destinations further along the Calder Highway.
Footpath Construction for Gaffney – Reckleben Street This project will involve constructing an asphalt pathway and gravel trail for Gaffney to Reckleben Street from Bowden Street to Domain Drive.
Footpath design for Reckleben and View streets This project involves designing a pathway on Reckleben and View streets to create safe pedestrian access between the town centre and the inner west of Castlemaine.
Footpath Design Program 2022-2023 Footpath design projects are scheduled in line with the Walking and Cycling Strategy and the annual Footpath Design Program of community identified footpaths adopted by Council.
Froomes Road bridge strengthening This project involved undertaking strengthening measures on the existing single lane bridge on Froomes Road in Castlemaine.
Golden Point Road Parking and Traffic Analysis for Expedition Pass Res As part of Council's commitment to improving pedestrian and traffic safety throughout the shire, Council is currently undertaking an analysis of parking and traffic at Expedition Pass Reservoir on Golden Point Road.